- Home
- ยป
- Products & Services
- »
- Erection Work
Erection Work
As per the needs and requirements of our clients, we are involved in providing Erection Work. This Erection Work is rendered by us in given time frame.
RCC Precast SWD Erection Work
Get Latest Price
Product Brochure
Being an eminent company, we are involved in rendering rcc precast swd erection work.Features:Highly reliablePrompt executionClient centric approach
Yes! I am InterestedRequest A Callback
RCC Precast Culvert Erection Work
Get Latest Price
Product Details:
metre | 18000 |
Additional Information:
- Production Capacity: 100m to 200m
- Delivery Time: with in 15 days
Yes! I am InterestedRequest A Callback
RCC Precast Building Erection Work
Get Latest Price
Product Brochure
Precast is a Construction friendly technology, which systematically splits up various elements of a Building as concrete components, in such a way to produce in a Factory and Integrate the produced component at Site, using proven scientific methods.The technology differentiates two types of products: Pre-cast parts assembled with in concrete finishingCompletely ready made pre-cast partsIn India, pre-cast parts assembled with in situ concrete finishing is widely accepted as a method of construction.Main Advantage Of Pre- Cast Concrete System Building with pre-cast concrete elements opens up the opportunity to have a production, because the required products can be stored ahead of time, no matter at what stage the construction is.Pre-casting takes place in work sheds and therefore weather conditions are irrelevantSupply can be stocked and only the quantity required will be shifted to the construction sitePre-cast concrete parts have a different rate of production when compared to the in situ construction at siteThis production technology is extremely precise when it comes to measuringThe steel reinforcement can be built exactly to the requirement and therefore used optimallyThe steel reinforcement can be completely built and set into the concrete parts and the time required to process reinforcement material at the construction site is reducedTransporting the pre-cast concrete parts to the construction site is easy from the factory safely.One more advantage lies in having smooth wall and ceiling surfaces. Plastering is not required as the concrete surface is good enough for paint work.Pre-cast concrete parts replace formwork at the construction site as they themselves form the layer into which in situ concrete is PouredNo deadlines for deshuttering of formworkNo transport, erecting and dismantling of formwork on site
Additional Information:
- Item Code: 68101190
- Production Capacity: 3000 Sqft Per Days
- Delivery Time: With in 15 days
Yes! I am InterestedRequest A Callback
RCC Precast Plinth Beam And Column Erection Work
Get Latest Price
Product Brochure
Product Details:
one metre | 15000 |
Yes! I am InterestedRequest A Callback
RCC Precast Louver Erection Work
Get Latest Price
Product Brochure
Product Details:
each | 15000.00 |
Yes! I am InterestedRequest A Callback